Safety and quality, managed on the deck.

Formwork and jumpform involve work at height, heavy lifts, temporary works and live loads. We manage these risks with planning, competent people and supervisors who are present.

Work Health and Safety

Safety is part of how every task is planned and supervised. We treat it as part of the job.

  • We comply with WHS legislation in NSW and the ACT and with each principal contractor's site safety requirements
  • Our directors and supervisors take personal responsibility for safety on our work fronts
  • Workers are encouraged and expected to raise hazards and stop unsafe work
  • Consultation with workers through pre-starts, toolbox talks and supervisor contact

Site safety procedures

Clear procedures, followed every day.

  • Safe Work Method Statements for high-risk construction work, prepared and reviewed with the crew
  • Daily pre-start meetings covering the day's tasks, lifts, exclusion zones and changes
  • Exclusion zones, edge protection and platform inspections maintained on formwork and jumpform
  • Adherence to the builder's permits, lifting plans and site rules

Risk management

We manage risk before work starts, then keep checking it while the work runs.

  • Hazards identified at planning stage, not discovered on the deck
  • Temporary works such as shoring and backpropping installed to design and checked before loading
  • Climb, lift and pour sequences planned with the builder's site team
  • Incidents and near misses reported, investigated and used to improve

Quality assurance

Getting it right before the pour costs far less than fixing it afterwards.

  • Set-out, levels and cast-in items checked against current drawings before closure
  • Engineer and certifier hold points booked and recorded, and closure only after written sign-off
  • Defects and NCRs responded to promptly, with close-out recorded
  • Daily records of handovers, inspections and directions

Workforce competency

The right people for the right task.

  • White card, licences and role-specific tickets verified before site
  • Experience matched to the task, so specialist work is done by experienced people
  • Leading hands and supervisors with trade backgrounds
  • Ticket records maintained and available to builders on request

Inductions and training

Every worker knows the site, the risks and the standard expected.

  • Company induction for every new worker
  • Site-specific inductions completed before the first shift
  • Training arranged where required, for example silica and asbestos awareness
  • Mentoring of newer workers by experienced tradespeople

Continuous improvement

We keep improving how we work.

  • Lessons from incidents, near misses and NCRs shared with crews
  • Feedback from builders reviewed and acted on
  • Systems, records and procedures developed as the business grows

Safe, compliant and accountable teams for your project.

Send through drawings, programme or a resourcing need. We'll respond within one business day with availability and a clear next step.