Formwork that holds the cycle.

Experienced formwork crews for commercial, healthcare, infrastructure and high-rise structures — planned around your pour sequence, crane availability and floor cycle.

Formwork

Overview

Formwork sets the pace of a concrete structure. When it is set out accurately, sequenced properly and stripped on time, the trades behind it keep moving. When it is not, every follow-on package pays for it.

FoxBuild provides formwork labour, leading hands and supervision to builders and formwork subcontractors across NSW and the ACT. Our people have worked on hospitals, metro stations, stadiums and high-rise towers, and they understand what a floor cycle demands: deck ready on time, edges and penetrations right first time, inspections passed and the next pour protected.

Capabilities

01Suspended slab formwork

Conventional and system decks, drop beams, band beams and slab edges, including set-out, levels and penetrations.

02Wall, column and core formwork

Crane-handled panels, single-sided walls, blade columns, lift and stair cores, and lobby walls.

03Stairs, landings and lobbies

Core stair and landing formwork co-ordinated with jumpform climbs and slab connections.

04Shoring, props and backpropping

H-frame and prop shoring installed to design, with backpropping sequences checked and recorded.

05Edge protection and screens

Perimeter screens, edge protection and exclusion zones maintained as the structure rises.

06Strip, clean and cycle

Controlled stripping, cleaning and relocating of formwork to keep the floor cycle on track.

Scope of services

  • Labour-only formwork crews with leading hands
  • Formwork supervision and foremen
  • Set-out from structural drawings and survey control
  • Penetrations, cast-in items, PSA and connector boxes placed to drawings
  • Pre-pour checks and hold-point coordination with engineers and certifiers
  • Backpropping installation and removal to sequence
  • Formwork stripping, material handling and housekeeping

Project applications

Commercial towersTypical floors, transfer levels and podiums
HealthcareHospital floors, plant rooms and service-heavy slabs
InfrastructureStation boxes, concourses and over-station structures
Residential high-riseApartment towers and podium car parks

Benefits to builders

What you gain.

01Programme certainty

Crews sized to the floor cycle, with supervision that plans tomorrow's work today.

02Fewer defects and rework

Set-out, cast-ins and pre-pour checks done properly before the certifier arrives.

03Safety built into the sequence

SWMS-led work, controlled exclusion zones and disciplined edge protection.

04One accountable contact

A FoxBuild supervisor who reports to your site team, not a roster of strangers.

Planning a structure? Talk to us early.

Send through drawings, programme or a resourcing need. We'll respond within one business day with availability and a clear next step.